桂林理工大学学报2016,Vol.36Issue(4):738-742,5.DOI:10.3969/j.issn.1674-9057.2016.04.015
地铁隧道暗挖施工地表沉降模拟分析
Ground settlement caused by the excavation of mined subway tunnel
摘要
Abstract
Tunnel constructed by shallow tunneling method would cause settlement more or less,so how to predict the amount of settlement means a lot to the construction.Based on the situ measurement and numerical simulation via FLAC3D,this article takes 6th line of Beijing subway for example,using FLAC3D to calculate the ground settlement caused by the shallow tunneling method.The result shows that the simulation is similar to the value we measured,and the settlement can be divided into three stages,while most settlement occurs when the excavation face overpasses.Reasonable simulation can approximately predict the settlement and provide advice for similar excavation.关键词
浅埋暗挖/地铁隧道/数值模拟/地表沉降Key words
shallow-buried excavation/subway tunnel/numerical simulation/ground settlement分类
交通工程引用本文复制引用
李涛,嵇长民,冀文欢,张文强,龚文波,万烨..地铁隧道暗挖施工地表沉降模拟分析[J].桂林理工大学学报,2016,36(4):738-742,5.基金项目
国家自然科学基金重点项目(U1261212) (U1261212)
国家自然科学基金青年科学基金项目(51508556) (51508556)
中央高校基本科研业务费专项资金项目(2009QL02) (2009QL02)
北京高等学校青年英才计划项目(YETP0944) (YETP0944)