海洋测绘2017,Vol.37Issue(2):39-41,50,4.DOI:10.3969/j.issn.1671-3044.2017.02.010
海港工程浚后测量的实施
Implementation of Harbor Dredging Engineering Surveys
宁林春 1方荣华 1黄辰虎 2王玉春1
作者信息
- 1. 91650部队,广东广州510320
- 2. 海军海洋测绘研究所,天津300061
- 折叠
摘要
Abstract
Through the comparison between the international standard requirement and the industry regulation requirement for dredging engineering technology,it is thought that the dredging engineering survey needs to grasp four key points of technology design,field survey,data processing and quality evaluation,and the field data collecting stage needs to focus on four key directions,including water level control,survey positioning,depth measuring and quality control etc.,in order to get the reliable survey data information,meet the requirement of the engineering survey for high-accuracy data and submit the high-quality survey achievement material.关键词
工程测量/海港工程/疏浚/数据采集/质量控制Key words
engineering survey/dredging engineering/dredge/data collection/quality control分类
天文与地球科学引用本文复制引用
宁林春,方荣华,黄辰虎,王玉春..海港工程浚后测量的实施[J].海洋测绘,2017,37(2):39-41,50,4.