气象2017,Vol.43Issue(3):365-372,8.DOI:10.7519/j.issn.1000-0526.2017.03.013
新一代天气雷达2009—2014年运行状态分析
Analysis of CINRAD Radar Operation Status During 2009-2014
摘要
Abstract
Atmospheric observing system operations and monitoring (ASOM)is a real-time monitoring sys-tem of observation equipment's running status and observation data.In this article,four operating indexes including availability of operation (Ao ),mean time between failures (MTBF),failure duration (Tfd ), number of failures (Nf)are evaluated on the basis of maintenance data of ASOM from 1 December 2009 to 30 November 2014.For the 2014 indexes,Ao and MTBFincrease to 99.06% and 1465.08 h respectively while Tfd and Nf reduce to 13.15 h and 4.68 times.In addition,the failure distribution and replacement of radar spare parts in these fault cases and their trends are quantified and evaluated for different radar sub-systems and different types of radar.The results,to some extent,make efforts to set up pertinent spare parts supply management,improve maintenance support capability of CINRAD,and,eventually,promote efficiency of China's meteorological observation equipment management.关键词
新一代天气雷达/运行评估/备件Key words
CINRAD/operational evaluation/radar spare parts分类
天文与地球科学引用本文复制引用
徐鸣一,李峰,夏元彩,李雁,曹婷婷,秦世广..新一代天气雷达2009—2014年运行状态分析[J].气象,2017,43(3):365-372,8.基金项目
山洪地质灾害防治气象保障工程项目和中国气象局气象关键技术项目(CMAGJ2014M71)共同资助 (CMAGJ2014M71)