Abstract

The main beams of the large-scale overhead crane are mainly provided with the T-shape steel bearing rail box structure.The paper analyzes the factors affecting the camber of the beam , introduces proper camber pre-fabricated val-ue based on plenty of measured data , and presents effective measures to control the camber welding deformation of the main beam, providing reference and guidance for pre-fabrication of main beam camber and the control of welding deformation .

关键词

桥式起重机/主梁/上拱/焊接变形

Key words

overhead crane/main beam/camber/welding deformation