Abstract

The speed regulating system of hydraulic turbine is one of the core control systems in hvdroelectric generating set,and the mnain distributing valve is one of the key equipment of hydraulic system of governor.The amount of internal leakage of governor of Unit 5 during shut down period after minor repair in Longtan Hydropower Plant is found to increase significantly.For solving this problem,the structural features of main distributing valve of governor in Longtan Hydropower Plant are analyzed,and the change rule between piston position and leakage volume of main distributing valve is also analyzed.Finally,some suggestions to reduce the internal leakage are put forward.

关键词

调速器/主配压阀/搭叠量/泄漏/龙滩水力发电厂

Key words

governor/main distributing valve/overlap value/leakage/Longtan Hydropower Plant

分类

信息技术与安全科学

引用本文复制引用

陈峰兵..龙滩水电厂主配压阀结构与肉泄漏分析[J].水力发电,2017,43(4):69-71,3.

水力发电

OA北大核心CSTPCD

0559-9342

访问量0
|
下载量0
段落导航相关论文