水力发电2017,Vol.43Issue(4):79-81,84,4.
龙滩水电站下游河道疏浚治理工程效益分析
Benefit Analysis of Downstream River Dredging Project of Longtan Hydropower Station
杨艳1
作者信息
- 1. 龙滩水电开发有限公司龙滩水力发电厂,广西天峨547300
- 折叠
摘要
Abstract
By summarizing the dredging situation of downstream channel of Longtan Hydropower Station,the changes of tailwater level in different outflows of Longtan Hydropower Station are analyzed,and the benefits of dredging project are also analyzed from the aspects of increasing power generation,reducing water consumption rate of electricity generation,and improving the flow pattern of tail water outlet.It can be seen from analysis results that the economic benefit of downstream channel dredging is very significant.关键词
效益分析/河道疏浚/下游/尾水位/龙滩水电站Key words
benefit analysis/river dredging/downstream/tailwater level/Longtan Hydropower Station分类
建筑与水利引用本文复制引用
杨艳..龙滩水电站下游河道疏浚治理工程效益分析[J].水力发电,2017,43(4):79-81,84,4.