路基工程Issue(2):9-14,6.DOI:10.13379/j.issn.1003-8825.2017.02.03
CRTS-Ⅰ型板式无砟轨道结构整体抬升纠偏设备方案设计研究
Research on Project Design of Deviation-correcting Device for Overall Lifting of CRTS-Ⅰ Plate-type Ballastless Track Structure
摘要
Abstract
A modernized large-scale mechanical equipment and supporting remediation technology suitable for such defect remediation is introduced aiming at the existing process of deviation-correcting for overall lifting structure.On the basis of analyzing the problems of the existing process thereof,the design idea and two design schemes of such equipment are proposed.关键词
CRTS-Ⅰ/无砟轨道/整体抬升/纠偏设备/方案设计Key words
CRTS-Ⅰ/ballastless track/overall lifting/deviation-correcting device/project design分类
交通工程引用本文复制引用
张二海,徐玉胜,付余..CRTS-Ⅰ型板式无砟轨道结构整体抬升纠偏设备方案设计研究[J].路基工程,2017,(2):9-14,6.基金项目
中国铁道科学研究院基金课题:铁路岩土工程病害快速整治新技术(1451SZ6604) (1451SZ6604)