煤矿安全2017,Vol.48Issue(z1):10-14,5.DOI:10.13347/j.cnki.mkaq.2017.S1.003
补连塔煤矿22303工作面两巷超前矿压规律实测分析与模拟研究
Measurement Analysis and Simulation Study on Advanced Ground Pressure Laws of Two Roadways at 22303 Working Face in Bulianta Coal Mine
祁杰 1刘柄良1
作者信息
- 1. 神华神东煤炭集团有限责任公司补连塔煤矿,内蒙古鄂尔多斯017209
- 折叠
摘要
Abstract
In order to grasp mine pressure behavior laws,strata structure features and support adaptability of fully mechanized working face with 7.0 m supprot,fully mechanized caving mining experiment was carried out at 22303 working face in Bulianta Coal Mine with 7.0 m support.On the basis of measuring advanced mine pressure of different mining stages of two roadways at 22303 working face with 7.0 m support,numerical modeling is used to analyze the change of abutment pressure and the change of two lanes bearing pressure with mining height.Results show that the stress influence scope of large mining height model is gradually increasing with the mining,and the growth of impact scope is rapid and stress value increases rapidly,and the advanced effect area caused by mining is 65 m.关键词
大采高/综放开采/超前矿压/支承压力/数值模拟Key words
large mining height/full-mechanized caving mining/advanced ground pressure/abutment pressure/numerical modeling分类
矿业与冶金引用本文复制引用
祁杰,刘柄良..补连塔煤矿22303工作面两巷超前矿压规律实测分析与模拟研究[J].煤矿安全,2017,48(z1):10-14,5.