煤矿安全2017,Vol.48Issue(z1):28-31,4.DOI:10.13347/j.cnki.mkaq.2017.S1.007
煤矿TBM工法大倾角长距离斜井路面铺设沥青技术
Laying Asphalt Pavement at Large Dip Angle and Long Distance Inclined Shaft by Coal Mine TBM Method
唐海军1
作者信息
- 1. 神华神东煤炭集团有限责任公司补连塔煤矿,内蒙古鄂尔多斯017209
- 折叠
摘要
Abstract
To lay asphalt pavement in large dip angle and long distance inclined shaft by TBM construction method,this paper analyzes the problems existing in the construction process from the particularity of coal mine,pointedly solves the technical barriers of bearing,water,ventilation and other aspects in construction process,and deeply researches technology and process in laying asphalt pavement in inclined shaft,which ensures smooth implementation of laying asphalt pavement in Bilianta Coal Mine;the construction quality can be improved and use effect is good.关键词
大倾角/长距离/斜井/沥青路面/TBM工法Key words
large dip angle/long distance/inclined shaft/asphalt pavement/TBM method分类
矿业与冶金引用本文复制引用
唐海军..煤矿TBM工法大倾角长距离斜井路面铺设沥青技术[J].煤矿安全,2017,48(z1):28-31,4.