煤矿安全2017,Vol.48Issue(z1):128-132,5.DOI:10.13347/j.cnki.mkaq.2017.S1.029
TBM工法在煤矿斜井施工中安全防范重点及应对措施
Safety Protection Emphasis and Countermeasures of TBM Method in Inclined Shaft Construction of Coal Mine
刘杰1
作者信息
- 1. 神华神东煤炭集团有限责任公司工程管理部,陕西神木719315
- 折叠
摘要
Abstract
Taking the engineering practice of single shield TBM method in 2# auxiliary transported adit of Bulianta Coal Mine as an example,the paper analyzes and introduces safety protection emphasis and countermeasures during the TBM construction,which provides reference and experience of engineering project by exploring the feasibility,safety and reliability of TBM technology in inclined and coal mine underground roadway construction.关键词
单护盾TBM工法/斜井施工/安全防范/应对措施/安全风险管理Key words
single shield TBM method/inclined shaft construction/safety protection/solutions/safety risk management分类
矿业与冶金引用本文复制引用