| 注册
首页|期刊导航|青岛大学学报(自然科学版)|基于BOM的网络工程集成管理应用研究

基于BOM的网络工程集成管理应用研究

张生福

青岛大学学报(自然科学版)2017,Vol.30Issue(1):96-102,7.
青岛大学学报(自然科学版)2017,Vol.30Issue(1):96-102,7.DOI:10.3969/j.issn.1006-1037.2017.02.19

基于BOM的网络工程集成管理应用研究

Network Project Integration Management Application Research Based on BOM

张生福1

作者信息

  • 1. 青海民族大学计算机学院,青海 810007
  • 折叠

摘要

Abstract

The method of network engineering project management mainly WBS, network diagram and gantt represented, mainly to control the progress.In this paper, the method of network engineering project management based on BOM, through the BOM (Bill of Manufacturing) based on product structure and the technological process and resources integration control, the comparison system generated BOM list, process flow, production task list, process order etc.The network control in the whole process of the engineering project management and single all-the-way tracking tasks can be performed.The method has been verified by an example on the ERP software.

关键词

网络图/甘特图/BOM/网络工程/集成管理

Key words

Network planning/gantt/BOM/network project/integrated management

分类

信息技术与安全科学

引用本文复制引用

张生福..基于BOM的网络工程集成管理应用研究[J].青岛大学学报(自然科学版),2017,30(1):96-102,7.

青岛大学学报(自然科学版)

1006-1037

访问量0
|
下载量0
段落导航相关论文