人民长江2017,Vol.48Issue(7):56-59,4.DOI:10.16232/j.cnki.1001-4179.2017.07.012
综合超前地质预报在大秦岭隧道中的应用
Application of integrated advance geological forecast in Daqinling Tunnel
洪庆仁 1吴勇 2卓勇 1张凡 2邱钦钦1
作者信息
- 1. 成都理工大学 地质灾害防治与地质环境保护国家重点实验室,四川 成都 610059
- 2. 成都理工大学 环境与土木工程学院,四川 成都 610059
- 折叠
摘要
Abstract
Due to the complex geological conditions of the area where high-risk tunnels pass through, the construction easily encounters unfavorable geological bodies, such as faults, folds, high geostress, karst aquifers, etc., which would cause geological disasters such as instability of surrounding rock , water gushing, rock burst,etc.Therefore, it is very important to find out unfavorable geological bodies and take support measures to ensure the construction safety before excavation.Because of the complex geological conditions and unfavorable geological bodies in the construction area, Daqinling Tunnel of Xi'an-Chengdu PDL (Passenger Dedicated Line), as one of the difficult and key sections in the whole line, is classified as a high-risk tunnel.In order to make sure that the tunnel construction smoothly passes through the unfavorable geological bodies, in the advance geological forecast,the integrated techniques of geological logging and geophysical prospecting(TSP and GPR) are adopted, and the unfavorable geological bodies are successfully forecasted , which provide effective guidance for tunnel construction.关键词
超前地质预报/TSP/地质雷达/高风险隧道Key words
advance geological forecast/TSP/Ground Penetrating Radar/high-risk tunnel分类
天文与地球科学引用本文复制引用
洪庆仁,吴勇,卓勇,张凡,邱钦钦..综合超前地质预报在大秦岭隧道中的应用[J].人民长江,2017,48(7):56-59,4.