水利水电技术2017,Vol.48Issue(3):82-86,5.DOI:10.13928/j.cnki.wrahe.2017.03.015
丰满水电站重建工程叠梁门分层取水水口取水效果研究
Study on water-intaking effect of multi-level intake with stoplog gate for Fengman Hydropower Station Reconstruction Project
路振刚 1孙双科 2刘志国 3柳海涛 2郑铁刚2
作者信息
- 1. 国网新源控股有限公司,北京 100053
- 2. 中国水利水电科学研究院,北京 100038
- 3. 丰满大坝重建工程建设局,吉林吉林132108
- 折叠
摘要
Abstract
In order to study the water-intaking effect of the multi-level intake with stoplog gate for Fengman Hydropower Station Reconstruction Project,the physical model test and the numerical simulative analysis on water temperature are carried out.The study result shows that the expected effect can not be obtained from the the multi-level intake with stoplog gate;i.e.on the one hand,the distance between the original dam and the new dam is only 120 m and the remaining part of the original dam forms a prepositive retaining wall,which has a impact on the temperature distribution between both the dams and leads to a large decrease of the temperature difference between the surface and the bottom,and thus restricts the operation effect of the stoplog gate;on the other hand,due to the distance of 120 m between the original dam and the new dam,when the operation of the hydropower station,only a quite less impact is there on the thermal flux at the gap of the original dam,that is to say,the existence of the original dam forms a prepositive retaining wall that actually plays the role of a stoplog gate.Based on the result mentioned above,it is suggested to replace the layout scheme of the multi-level intake with stoplog gate with that of the conventional one.关键词
丰满水电站重建工程/叠梁门/分层取水/布置方案/取水效果/数值模拟Key words
Fengman Hydropower Station Reconstruction Project/stoplog gate/multi-level intake/layout plan/Water-intaki effect/numerical modeling分类
建筑与水利引用本文复制引用
路振刚,孙双科,刘志国,柳海涛,郑铁刚..丰满水电站重建工程叠梁门分层取水水口取水效果研究[J].水利水电技术,2017,48(3):82-86,5.