水道港口2017,Vol.38Issue(2):156-161,6.
汉江襄阳以下梯级枢纽联合优化调度研究
Study on combined optimal operation of cascade junction in the lower reaches of Xiangyang section, Hanjiang River
摘要
Abstract
To achieve the maximum comprehensive benefit, it is necessary to coordinate various tasks through the combined scheduling system of integrated junctions. In this paper, the optimal operation target of Cuijiaying junction and Yakou junction in the Hanjiang River was researched through analyzing the restrictive relation be-tween generation benefit and navigation base flow rate based on the FPGA. A scheduling mode calculated in the pe-riod of weeks was established. The optimal scheduling scheme and the criterion of cascade junction with comprehen-sive consideration of shipping and electric power generation were proposed. The methods of improving the basic flow protection rate of the following cascade junctions in the lower reaches of Xiangyang section in the Hanjiang Riv-er were preliminarily discussed.关键词
枢纽/调度/多目标/优化Key words
integrated junction/scheduling/multi-objective/optimization分类
交通工程引用本文复制引用
王晓旭,徐俊锋,高清洋,刘俊涛..汉江襄阳以下梯级枢纽联合优化调度研究[J].水道港口,2017,38(2):156-161,6.基金项目
CSSN-服务-38-09 ()
中央级公益性科研院所基本科研业务费(TKS150102) (TKS150102)