铁道标准设计2017,Vol.61Issue(6):111-115,5.DOI:10.13238/j.issn.1004-2954.2017.06.023
电缆隧道圆形竖井结构设计方法研究
Study on Design Method of Circular Vertical Shaft Structure in Cable Tunnel
摘要
Abstract
As the design of circular vertical shaft is not explicitly defined in various industrial standards, the calculation methods of shaft's lateral pressure and circular horizontal radial load in domestic and foreign norms are analyzed and demonstrated based on the interpretation of relevant criteria, and three calculation methods are used to reach some reasonable conclusions. The results show that Rankine earth pressure formula is applicable to calculating lateral pressure of vertical shaft; reduction factor of 25% is introduced into horizontal radial load; 3 the load-structure method adopts active load and passive load pattern. The design method is mainly based on 2D load-structure method assisted by 3D load-structure method and 3D continuum FEM during the process of structure design.关键词
圆形竖井/径向荷载/结构设计方法/有限元分析Key words
Circular vertical shaft/Radial load/Structural design method/FEM分类
交通工程引用本文复制引用
谢阳,赵玉成,武淑敏,李兵兵..电缆隧道圆形竖井结构设计方法研究[J].铁道标准设计,2017,61(6):111-115,5.基金项目
石家庄铁道大学研究生创新项目(yc2016017) (yc2016017)