| 注册
首页|期刊导航|铀矿冶|矿山测量在复杂施工条件下溜井贯通中的应用实践

矿山测量在复杂施工条件下溜井贯通中的应用实践

杨毅 张志和 朱煜峰

铀矿冶2017,Vol.36Issue(2):81-83,3.
铀矿冶2017,Vol.36Issue(2):81-83,3.DOI:10.13426/j.cnki.yky.2017.02.002

矿山测量在复杂施工条件下溜井贯通中的应用实践

Application of Mining Survey in Vein Construction under the Complicated Condition

杨毅 1张志和 2朱煜峰2

作者信息

  • 1. 东华理工大学,江西南昌330013
  • 2. 核工业江西矿冶局,江西南昌330006
  • 折叠

摘要

Abstract

Mining survey is known as the eye of mine production and construction.It can draw accurate plan of excavation works in time to reflect the mutual space position of roadway and stope,and ensure the rational exploitation and utilization of mineral resources,reduce the loss of ore,and prevent the occurrence of security incidents effectively.Based on the actual production of one uranium mine,in accordance with a cutting precipice filling method at a stope by outside ore chute to backstopping gentle dip ore body,the application of mining survey technology in the design and construction of the vein outside the mine is analyzed in this paper.

关键词

矿山测量/脉外溜矿井/削壁充填法/全站仪

Key words

mining survey/ore pass out of the vein/waste lifting stoping/total station

分类

矿业与冶金

引用本文复制引用

杨毅,张志和,朱煜峰..矿山测量在复杂施工条件下溜井贯通中的应用实践[J].铀矿冶,2017,36(2):81-83,3.

铀矿冶

OACSTPCD

1000-8063

访问量0
|
下载量0
段落导航相关论文