高速铁路建设项目建设过程后评价研究

韩涛

铁道科学与工程学报2017,Vol.14Issue(5):913-921,9.
铁道科学与工程学报2017,Vol.14Issue(5):913-921,9.

高速铁路建设项目建设过程后评价研究

Research on the post-assessment of the construction process of high speed railway construction project

韩涛1

作者信息

  • 1. 中铁第四勘察设计院集团有限公司工程经济设计处,湖北 武汉430000
  • 折叠

摘要

Abstract

Construction project post-evaluation that is the important link of project life cycle management is essential for high-speed railway construction project. For high-speed railway construction projects, the investment scale is larger and wider, How to scientifically and reasonably evaluate the construction process of the high-speed railway construction project has become increasingly important. Based on the life cycle perspective, this paper described the status of China's high-speed railway construction, combines with the unique characteristics of high-speed railway construction projects, and constructs high-speed railway construction project evaluation index system. Combined with the fuzzy matter element method, based on the structural equation model, the high speed railway construction project construction process was evaluated, and the model was verified by the example of JH high speed railway, and the good result was obtained.

关键词

高速铁路建设项目/建设项目后评价/模糊物元/结构方程模型

Key words

high-speed railway construction project/post evaluation of construction project/fuzzy matter element/structural equation model

分类

交通工程

引用本文复制引用

韩涛..高速铁路建设项目建设过程后评价研究[J].铁道科学与工程学报,2017,14(5):913-921,9.

基金项目

铁路工程定额所资助项目(2014DE22) (2014DE22)