| 注册
首页|期刊导航|铁道科学与工程学报|楔形管桩沉桩及桩端后注浆可视化模型试验

楔形管桩沉桩及桩端后注浆可视化模型试验

曹兆虎 孔纲强 文磊 李辉

铁道科学与工程学报2017,Vol.14Issue(5):922-927,6.
铁道科学与工程学报2017,Vol.14Issue(5):922-927,6.

楔形管桩沉桩及桩端后注浆可视化模型试验

Visualization model test on tapered pipe pile installation and pile tip grouting process

曹兆虎 1孔纲强 2文磊 1李辉2

作者信息

  • 1. 河海大学岩土力学与堤坝工程教育部重点实验室,江苏 南京 210098
  • 2. 河海大学 土木与交通学院,江苏 南京 210098
  • 折叠

摘要

Abstract

Based on both transparent soil and PIV technique, one visualization model test on precast tapered pile installation and pile end grouting construction process was carried out. The soil displacement around the tapered pile during pile installation was measured and the shape of the formed enlarged pile base was also observed during pile end grouting process. The test results showed that the soil displacement around the tapered pile was different from that of the uniform section pile. The maximum displacement was located on the top around the pile and the pile end grouting exhibited the typical cavity expansion mode. Transparent soil and PIV technique could visualize the installation and pile end grouting process of tapered pile, provide more information for pile design and construction and would have a wider application in pile-soil interaction problems.

关键词

楔形桩/透明土/位移场/后注浆/模型试验

Key words

tapered pile/transparent soil/displacement field/grouting/model test

分类

建筑与水利

引用本文复制引用

曹兆虎,孔纲强,文磊,李辉..楔形管桩沉桩及桩端后注浆可视化模型试验[J].铁道科学与工程学报,2017,14(5):922-927,6.

基金项目

国家自然科学基金资助项目(51478165) (51478165)

铁道科学与工程学报

OA北大核心CSCDCSTPCD

1672-7029

访问量0
|
下载量0
段落导航相关论文