| 注册
首页|期刊导航|电工技术学报|基于鲁棒优化的网架重构机组恢复顺序优化

基于鲁棒优化的网架重构机组恢复顺序优化

焦洁 刘艳

电工技术学报2017,Vol.32Issue(11):77-86,10.
电工技术学报2017,Vol.32Issue(11):77-86,10.

基于鲁棒优化的网架重构机组恢复顺序优化

Optimization of Units' Restoration Sequence during Network Reconfiguration Process Based on Robust Optimization

焦洁 1刘艳1

作者信息

  • 1. 华北电力大学电气与电子工程学院 保定 071003
  • 折叠

摘要

Abstract

Current power systems mainly consist of thermal units, the length of units' recovery time after blackout determines the effect of network reconfiguration significantly.In response to this problem, aiming at the possible delay when units prepare to start and start up.In this paper, the robust optimization model for units' restoration sequence is set up which considers uncertain units start time, and treat insufficient electricity as optimization goal during minimum reconfiguration period.Then, crossover particle swarm algorithm and CPLEX optimization solution are combined to solve this model.Based on this, a units' recovery sequence which can quantitative characterization effort of recovery and operation reliability can be received.Providing the reference for dispatcher to cope with the worst possible restore hysteretic scene.Further, for the proposed units' recovery sequence given by dispatcher, they can get the probability of successful implementation estimated by operating experience and obtained the key steps by CPLEX to ensure recovery effect.The outcome of its application on the New England 10-unit 39-bus power system and a region grid indicate the validity of the method proposed.

关键词

网架重构/机组恢复/机组启动时间不确定性/鲁棒优化

Key words

Network reconfiguration/unit recovery/uncertain time of thermal units startup/robust optimization

分类

信息技术与安全科学

引用本文复制引用

焦洁,刘艳..基于鲁棒优化的网架重构机组恢复顺序优化[J].电工技术学报,2017,32(11):77-86,10.

基金项目

国家自然科学基金资助项目(51277076,51677071). (51277076,51677071)

电工技术学报

OA北大核心CSCDCSTPCD

1000-6753

访问量0
|
下载量0
段落导航相关论文