摘要

Abstract

After high voltage direct current (HVDC) is blocked, frequency deviation and power translation will emerge in the receiving-end of hybrid AC/DC system.Such accidents as under-frequency load shedding and branch violation would become more serious.For the purpose of solving the above problems, a unit commitment model is proposed for receiving-end power grid in the hybrid AC/DC system, including capacity constraints on primary frequency regulation and bus voltage/branch power constraints when secondary frequency regulation finishes.As a result, frequency and power flow would be ensured while HVDC blocked failure happens.According to the characteristics of the model, Benders decomposition and mixed integer programming algorithms are used to get the optimal transmission power of HVDC and planning of normal units.HVDC power will be completely accommodated while AC/DC system safety will be ensured.In the end, two typical cases of 10-machine 39-node system and Jiangsu power grid are employed to test the correctness and effectiveness of the model.

关键词

交直流混联电网/机组组合/高压直流闭锁/Benders/混合整数规划

Key words

hybrid AC/DC power grid/unit commitment/high voltage direct current(HVDC)blocked/Benders/mixed integer programming

引用本文复制引用

张宁宇,周前,唐竞驰,刘建坤,陈哲..适用于交直流混联受端电网的机组组合模型及算法[J].电力系统自动化,2017,41(11):77-84,105,9.

基金项目

国家自然科学基金资助项目(51607092) (51607092)

国家电网公司科技项目"适应交直流混联受端电网的大规模海上风电接入方式优化及运行控制技术研究" ()

This work is supported by National Natural Science Foundation of China (No.51607092) and State Grid Corporation of China. (No.51607092)