| 注册
首页|期刊导航|广东电力|基于负荷转移的钢铁企业自备电厂发用电联合优化模型

基于负荷转移的钢铁企业自备电厂发用电联合优化模型

张楠 顾立群 彭道刚 张浩

广东电力2017,Vol.30Issue(5):40-47,8.
广东电力2017,Vol.30Issue(5):40-47,8.DOI:10.3969/gddl/gddl2017/1705/170508.htm

基于负荷转移的钢铁企业自备电厂发用电联合优化模型

Combined Optimized Model for Power Generation and Consumption in Autonomous Power Plant of Steel Companies Based on Load Shifting

张楠 1顾立群 2彭道刚 1张浩1

作者信息

  • 1. 上海发电过程智能管控工程技术研究中心(上海电力学院 自动化工程学院),上海 200090
  • 2. 宝山钢铁股份有限公司电厂,上海 201900
  • 折叠

摘要

Abstract

On the basis of influence of time of use (TOU) price on generator production schedule and transferable load schedule in the work time, this paper establishes a combined optimized model for power generation and consumption in steel companies with autonomous power plants. It obtains transferable load based on accurate analysis on electric equilibrium, and considering uncertainty of load, it works out output distribution of the generator from the minimum power consumption cost and then calculates load operating time by combining the load shifting model and price constraint. Example result indicates that electricity price of different peak time has different influence on transferable load schedule, and the company must reasonably make use of TOU price to arrange transferable load and optimize the generator as well as reduce power generation cost so as to acquire the maximum economic benefit.

关键词

分时电价/负荷转移/电平衡/联合优化/自备电厂

Key words

time of use price/load shifting/electric equilibrium/combined optimization/autonomous power plant

分类

信息技术与安全科学

引用本文复制引用

张楠,顾立群,彭道刚,张浩..基于负荷转移的钢铁企业自备电厂发用电联合优化模型[J].广东电力,2017,30(5):40-47,8.

基金项目

上海市"科技创新行动计划"社会发展领域项目(16DZ1202500) (16DZ1202500)

上海市"科技创新行动计划"高新技术领域项目(16111106300) (16111106300)