矿产综合利用Issue(3):103-104,94,3.DOI:10.3969/j.issn.1000-6532.2017.03.021
桦树沟铜矿尾矿输送工业试验
Tailings Slurry Transportation Industry Test of Huashugou Copper Mine
摘要
Abstract
In order to meet the needs of the Huashugou Copper Mine filling material supply,to achieve high altitude settlement to particles in long distance slurry pipeline continuous conveyor,the engineering design research and industrial application test fortailing transportation were carried out.The results show that the concentration of 40% ~ 45% mortar conveying process in the tail up height of more than 200m in the pipeline pressure keep in 4.1 ~4.6 MPa.When the material supply and stable concentration,inlet and outlet pipes and all key parts can maintain normal working conditions,and when the normal production of tailings slurry filling,the material supply can be transported to the high mountain in the underground filling station and transportation flow and transportation concentration can meet the needs of daily production.关键词
尾矿浆输送/长距离管道/高山地区/泵送压力Key words
Tailings slurry transportation/Long distance pipeline/High mountain area分类
矿业与冶金引用本文复制引用
邓代强,康瑞海,姚中亮,杨耀亮..桦树沟铜矿尾矿输送工业试验[J].矿产综合利用,2017,(3):103-104,94,3.基金项目
“十二五”国家科技支撑计划项目:金属矿床高效地下开采关键技术研究及示范(2013BAB02B04) (2013BAB02B04)