| 注册
首页|期刊导航|工程科学学报|基于混合整数规划法的自然崩落法放矿计划优化

基于混合整数规划法的自然崩落法放矿计划优化

任助理 毕林 王李管 陈鑫

工程科学学报2017,Vol.39Issue(1):23-30,8.
工程科学学报2017,Vol.39Issue(1):23-30,8.DOI:10.13374/j.issn2095-9389.2017.01.003

基于混合整数规划法的自然崩落法放矿计划优化

Optimization of drawing scheduling based on mixed integer programming in block cave mining

任助理 1毕林 2王李管 1陈鑫2

作者信息

  • 1. 中南大学资源与安全工程学院,长沙410083
  • 2. 中南大学数字矿山研究中心,长沙410083
  • 折叠

摘要

Abstract

Drawing scheduling is the most important process in block cave mining.The traditional analysis process of drawing scheduling is random and inefficient without system scientific analysis.A mixed integer programming method was proposed in this paper to solve the optimization problem of drawing scheduling.Taking the ore reserve quantity,ore grade,drawing index and production scheduling index as the constraints and the grade fluctuation as the objective function,a drawing scheduling optimization model was built based on the mixed integer programming method.It was solved with the CPLEX solver invoked by model language that was programmed with YALMIP in MATLAB for a certain copper mine.Finally,the optimal arrangement scheme of drawing scheduling was obtained.It is proved that this model is scientific and feasible,the grade fluctuation reduces by 18%,and compared with the traditional,this drawing scheduling saves costs by meeting the desired production quantity more closely and reducing the employee time spent on preparing schedules.

关键词

自然崩落采矿法/混合整数规划/放矿/计划/优化

Key words

block caving method/mixed integer programming/drawing/scheduling/optimization

分类

矿业与冶金

引用本文复制引用

任助理,毕林,王李管,陈鑫..基于混合整数规划法的自然崩落法放矿计划优化[J].工程科学学报,2017,39(1):23-30,8.

基金项目

中央高校基本科研业务费资助项目(2016zzts450) (2016zzts450)

国家自然科学基金资助项目(41572317) (41572317)

工程科学学报

OA北大核心CSCDCSTPCD

2095-9389

访问量0
|
下载量0
段落导航相关论文