现代制造工程Issue(3):116-121,6.DOI:10.16731/j.cnki.1671-3133.2017.03.020
多节点流水线制造车间订单接受与调度研究
Multi-node flow-line manufacturing shop order acceptance and scheduling
摘要
Abstract
In the Just-In-Time(JIT) mode development background,order delivery delay punishment and product inventory costs by more and more attention.To solve the balance problems delayed punishment orders and inventory costs between the limited capacity preconditions,to establish a total maximum profit integrated decision method of order acceptance and scheduling.Using on an improved double-coded genetic algorithm to solve the model.Finally,examples of verification,by comparison with several order selection heuristic rules,and improve before and contrast the improved algorithm,respectively demonstrate the effectiveness and feasibility of the model and algorithm.关键词
订单接受与调度/改进型遗传算法/多节点流水线车间/延迟惩罚与库存成本Key words
order acceptance and scheduling/improved genetic algorithm/multi-node flowshop/delay punishment and inventory costs分类
信息技术与安全科学引用本文复制引用
宋李俊,向波,李攀..多节点流水线制造车间订单接受与调度研究[J].现代制造工程,2017,(3):116-121,6.基金项目
重庆工商大学科研平台开放课题资助项目(1456024) (1456024)