| 注册
首页|期刊导航|水利学报|梯级水电站负荷调整方案评价指标体系及决策模型

梯级水电站负荷调整方案评价指标体系及决策模型

纪昌明 李荣波 刘丹 张璞 张验科 周婷

水利学报2017,Vol.48Issue(3):261-269,9.
水利学报2017,Vol.48Issue(3):261-269,9.DOI:10.13243/j.cnki.slxb.20160570

梯级水电站负荷调整方案评价指标体系及决策模型

Assessment index system and decision-making model for load adjustment schemes of cascade hydropower stations

纪昌明 1李荣波 1刘丹 2张璞 1张验科 1周婷3

作者信息

  • 1. 华北电力大学可再生能源学院,北京 102206
  • 2. 中国水利水电科学研究院,北京100038
  • 3. 安徽农业大学水利工程系,安徽合肥230036
  • 折叠

摘要

Abstract

The preference of cascade hydropower stations' load adjustment schemes directly impacts the benefits and risks of power generation sector.However,due to incompleteness of existing risk-benefit synergy assessment index system,it is unable to conduct a comprehensive and effective assessment on load adjustment schemes so far.This article aims to establish a systematic risk-benefit synergy assessment approach to improve the accuracy and effectiveness of load adjnstment schemes assessment.In this article,authors proposed a comprehensive index system of risk-benefit synergy assessment based on the actual cascade hydropower stations operation process;defined generation risk rate,load fluctuation risk rate,and opportunity loss risk as new indexes then put forward their calculation formulas;besides,introduced the correlation coefficient matrix to replace the covariance matrix of Mahalanobis distance to address the deficiency of the traditional grey target decision-making model in terms of insensitivity of relative indexes;in addition,used the relative bull's-eye to calculate and sort the non-inferior sets.According to the case study of Jinping-guandi cascade hydropower stations of the Yalong River in which a comparison was performed between the traditional grey target model and the grey target model based on Mahalanobis distance,the methodology proposed by this article shows more reasonable results,which can be an important reference for future research on load adjustment of cascade hydropower stations.

关键词

梯级水电站/负荷调整方案/风险效益协同评价/指标体系/改进灰靶决策模型

Key words

cascade hydropower stations/load adjustment schemes/risk-benefit synergy assessment/index system/an improved grey target decision-making model

分类

建筑与水利

引用本文复制引用

纪昌明,李荣波,刘丹,张璞,张验科,周婷..梯级水电站负荷调整方案评价指标体系及决策模型[J].水利学报,2017,48(3):261-269,9.

基金项目

国家自然科学基金项目(51279062,51509001) (51279062,51509001)

“十三五”国家重点研究计划课题(2016YFCO402208) (2016YFCO402208)

中央高校基本科研业务费专项资金(2016MS51,2016XS58) (2016MS51,2016XS58)

中国水利水电科学研究院流域水循环模拟与调控国家重点实验室开放研究基金(IWHR-SKL-201420) (IWHR-SKL-201420)

雅砻江流域水电开发有限公司(JKZX-201416-01) (JKZX-201416-01)

水利学报

OA北大核心CSCDCSTPCD

0559-9350

访问量0
|
下载量0
段落导航相关论文