水利学报2017,Vol.48Issue(3):270-278,9.DOI:10.13243/j.cnki.slxb.20160075
大规模水电系统优化调度降维方法研究Ⅱ:方法实例
Study on dimension reduction for optimal operation of large-scale hydropower system Ⅱ.Example for the method
摘要
Abstract
In order to solve the curse of dimensionality of joint optimal operation of large-scale hydropower system,orthogonal dimension reduction search algorithm (ODRSA) is presented on the basis of orthogonal experiment design.ODRSA solves the joint optimization scheduling problem of hydropower system by carrying out the orthogonal experimental design in the neighborhood of initial solution.During the iteration,some representative solutions are selected to calculate and the starting point will be replaced if the better solution is found.Analysis shows that the time complexity and space complexity of ODRSA are square.Simulation results of the cascade hydropower stations on the Wujiang River indicate that:ODRSA is a novel method for large-scale hydropower system with less calculation parameters,fast convergence speed and strong robustness.关键词
水电/优化调度/正交试验设计/降维/维数灾/邻域搜索/计算复杂度Key words
hydropower system/optimal operation/orthogonal experiment/dimensionality reduction/dimensional disaster/local search/computation complexity分类
建筑与水利引用本文复制引用
冯仲恺,牛文静,程春田,武新宇,申建建..大规模水电系统优化调度降维方法研究Ⅱ:方法实例[J].水利学报,2017,48(3):270-278,9.基金项目
国家自然科学基金重大计划重点支持项目(91547201) (91547201)
国家自然科学基金重大国际合作项目(51210014) (51210014)
国家重点基础研究发展计划(973计划)项目(2013CB035906) (973计划)