水资源与水工程学报2017,Vol.28Issue(1):152-156,5.DOI:10.11705/j.issn.1672-643X.2017.01.27
东山拦河闸加固改造工程消能研究
Study on rebuilding of dongshan barrage downstream energy dissipater
黄智敏 1陆汉柱 1付波 1钟勇明1
作者信息
- 1. 广东省水利水电科学研究院广东省水动力学应用研究重点实验室,广东广州510635
- 折叠
摘要
Abstract
Owing to the downstream stilling basin of the barrage suffered destroy in Dongshan,the downstream river bed was cut and the water-level degraded,the downstream energy dissipater of barrage needs reinforcement and reconstruction.Through the hydraulic model test,based on the reinforcement and reconstruction of the current downstream stilling basin of the barrage,in order to ensure the safe operation of the sea-flood section at downstream stilling basin,the auxiliary energy dissipaters suah as baffle block and baffle sill were set in sea-flood section.The research showed that,after setting the multistage baffle sills in the stilling basin downstream sea-flood section,the energy dissipation rate reached 50% at the sea-flood section,and ensured the flow of the stilling basin being connected more smoothly with the downstream river flow.The research achievement has been applied in engineering construction,and can be a reference for similar engineering design and operation.关键词
拦河闸/消力池/加固改造/消力坎/消能Key words
barrage/stilling basin/reinforcement and reconstruction/baffle sill/energy dissipation分类
建筑与水利引用本文复制引用
黄智敏,陆汉柱,付波,钟勇明..东山拦河闸加固改造工程消能研究[J].水资源与水工程学报,2017,28(1):152-156,5.