水资源与水工程学报2017,Vol.28Issue(1):226-229,235,5.DOI:10.11705/j.issn.1672-643X.2017.01.40
超大直径盾构施工地表沉降分析
Analysis of ground surface settlement induced by the super-diameter shield construction
程磊标 1陈有亮 1王苏然 1黄煜1
作者信息
- 1. 上海理工大学环境与建筑学院,上海200093
- 折叠
摘要
Abstract
Combining with an engineering case,this paper analyzed the measured data of ground surface settlement caused by the super-diameter slurry shield subway tunnel construction.The general rule of the ground displacement happened above the center axis of the subway tunnel during the shield advance as well as the settlement patterns of ground transverse section caused by ground layer loss were obtained.Through fitting Peck formula with the measured data of transverse settlement groove,the general ranges of the characteristic parameters such as width factor of settlement tank and ground layer loss ratio.Advices were given after analyzing the impacts of stop working during the advance of the tunneling shield on ground surface settlement.The findings in this study may provide a good reference to urban super-diameter slurry shield projects.关键词
超大直径/泥水平衡盾构/地铁隧道/地表沉降/地层损失Key words
super-diameter/slurry shield/subway tunnel/ground surface settlement/ground loss分类
建筑与水利引用本文复制引用
程磊标,陈有亮,王苏然,黄煜..超大直径盾构施工地表沉降分析[J].水资源与水工程学报,2017,28(1):226-229,235,5.