基于浅海吹填区海底管线监测的方案设计

Design Strategy Based on Monitoring Facilities for Submarine Pipeline and Cables within Shallow Sea Dredger-filled Area

苑放 1刘海宝2

作者信息

  • 1. 天津临港建设开发有限公司,天津 300452
  • 2. 中交第一航务工程勘察设计院有限公司,天津 300222
  • 折叠

摘要

Abstract

The settlement and displacement of submarine pipelines and cables within the dredger-filled area will happen during sea reclamation. Thus a monitoring platform should be set over the submarine pipelines and cables in order to collect the data on settlement and displacement. An engineering example is analyzed to expound the structure, construction plan and working principle of the monitoring facilities for the settlement and displacement of submarine pipelines and cables during the construction. The conclusion will provide a reference for similar projects.

关键词

吹填区/海底管线/监测

Key words

dredger-filled area/submarine pipelines and cables/monitoring