丹江口水利枢纽供水调度方式
The study on water-supply scheduling ways of Danjiangkou hydro project
摘要
Abstract
The method of water-supply scheduling is an important issue concerning producing more benefit s from the Danjiangk-ou hydro project. In this paper, a graph of water-supply scheduling was proposed for efficient utilization of water resources, based on The planning & design achievements of the Phase-I South-to-North Water T ransfer Middle-Route Project and the re-quirements on water scheduling scheme compilation for the M iddle Route Project. Meanw hile, designed hydrological inflow s were used to check the proposed scheduling graph. Results showed that The graph is clear and easy to operate. The operation of Danjiangkou hydro project based on this graph can satisfy the designed water demand of all users and make the water transfer process more balanced. The scheduling graph can guide the operation of Danjiangkou hydro project.关键词
丹江口水利枢纽/供水调度图/南水北调中线Key words
Danjiangkou hydro project/water-supply scheduling graph/The middle route of the South-to-North Water Transfer Project分类
水利科学引用本文复制引用
张利升,张睿,孟明星..丹江口水利枢纽供水调度方式[J].南水北调与水利科技,2017,15(3):25-29,5.基金项目
国家重点研发计划项目资助(2016YFC0400907) National key Research and Development Program of China (2016YFC0400907) (2016YFC0400907)