水利水电科技进展2017,Vol.37Issue(4):42-46,62,6.DOI:10.3880/j.issn.1006-7647.2017.04.008
除险加固水闸的消能防冲措施
Energy dissipation and scour prevention measures of reinforced sluices
韩成银 1刘红军 1傅宗甫 2崔贞2
作者信息
- 1. 江苏省洪泽湖大堤高良涧闸加固工程建设处,江苏 淮安 223199
- 2. 河海大学水利水电学院,江苏 南京 210098
- 折叠
摘要
Abstract
Based on hydraulic model tests of a reinforcement project, the water flow pattern, velocity distribution, maximum depth-averaged velocity of a typical section, and scouring characteristics downstream of the sluice were measured, and the cause of water flow pattern deterioration and scour severity under the design scheme were analyzed. The cause is considered to be the change of the flow boundary condition after reinforcement of the downstream wing wall, which concentrates the main flow downstream of the sluice, increases the velocity locally, and intensifies scouring. Through comparison of different energy dissipation and scour prevention schemes, the method of using partition piers to eliminate the flow accumulation is put forward. Partition piers can eliminate the main flow extrusion by the boundary, improve the flow pattern downstream of the sluice, homogenize the velocity distribution downstream of the sluice, reduce the maximum velocity of the river bed, and decrease scour downstream of the sluice. The partition piers have a simple structure and construction.关键词
除险加固/水闸/消能防冲/分隔墩Key words
reinforcement/sluice/energy dissipation and scour prevention/partition pier分类
建筑与水利引用本文复制引用
韩成银,刘红军,傅宗甫,崔贞..除险加固水闸的消能防冲措施[J].水利水电科技进展,2017,37(4):42-46,62,6.