| 注册
首页|期刊导航|水利水电科技进展|泵站前池单排方柱整流措施数值模拟

泵站前池单排方柱整流措施数值模拟

夏臣智 成立 赵国锋 于磊 吴牧天 徐文涛

水利水电科技进展2017,Vol.37Issue(4):53-58,6.
水利水电科技进展2017,Vol.37Issue(4):53-58,6.DOI:10.3880/j.issn.1006-7647.2017.04.010

泵站前池单排方柱整流措施数值模拟

Numerical simulation of flow pattern in forebay of pump station with single row of square columns

夏臣智 1成立 1赵国锋 1于磊 1吴牧天 1徐文涛1

作者信息

  • 1. 扬州大学水利与能源动力工程学院,江苏 扬州 225000
  • 折叠

摘要

Abstract

In order to improve the flow pattern in the foreway of a pump station, the RNG k-ε turbulence model based on the Fluent software was used to simulate the flow pattern in the front inflow forebay of a pump station with a single row of square columns, and the effect of geometric parameters of these square columns on the flow pattern in the foreway was analyzed. The results show that a single row of square columns leads to flow separation, the water flowing through the square columns disperses to the two sides of the foreway, and vortices form behind the square columns. Without rectification measures, the flow pattern is disorderly in the forebay, but it is significantly improved when a single row of square columns are arranged in the forebay. These square columns should be arranged in the forepart and middle of the forebay, not in the backflow zone at the two sides. The flow separation effect decreases and the approach velocity is more non-uniform with the decrease of the width of square columns.

关键词

泵站/前池/整流措施/方柱/流态/数值模拟

Key words

pump station/forebay/rectification measure/square column/flow pattern/numerical simulation

分类

建筑与水利

引用本文复制引用

夏臣智,成立,赵国锋,于磊,吴牧天,徐文涛..泵站前池单排方柱整流措施数值模拟[J].水利水电科技进展,2017,37(4):53-58,6.

基金项目

国家科技支撑计划(2015BAD201301-02) (2015BAD201301-02)

江苏省研究生培养创新工程(KYLX16-1395) (KYLX16-1395)

江苏省大学生学术科技创新基金(201611117030Z) (201611117030Z)

水利水电科技进展

OA北大核心CSCDCSTPCD

1006-7647

访问量4
|
下载量0
段落导航相关论文