铁道标准设计2017,Vol.61Issue(7):23-27,5.DOI:10.13238/j.issn.1004-2954.2017.07.006
"十三五"期间各规划铁路引入银川铁路枢纽总图方案研究
Study on General Planning for Introducing Planned Railways into Yinchuan Terminal
孙大为1
作者信息
- 1. 中铁第一勘察设计院集团有限公司,西安 710043
- 折叠
摘要
Abstract
For the planned railways to be introduced into the existing railway terminal following the principle of full use of existing facilities, well coordination of point and line abilities, smooth train path, appropriate layout of passenger and freight facilities and the adaptation to the requirements of the overall urban development planning, this paper focuses on the introduction of such planned short-term and long-term railways into Yinchuan railway terminal as Baotou-Yinchuan railway, Qingdao-Yinchuan railway, Yinchuan-Alashan branch line and Yinchuan bypass freight line. Schemes adaptable to the introduction of each project into Yinchuan terminal are selected based on technical and economic comparison. The overall consideration of each project contributes to the implementation the planned projects.关键词
银川枢纽/包头至银川铁路/银川至阿拉善支线/青银高铁Key words
Yinchuan terminal/Baotou-Yinchuan railway/Yinchuan-Alashan brand railway line/Qingdao-Yinchuan railway分类
交通工程引用本文复制引用
孙大为.."十三五"期间各规划铁路引入银川铁路枢纽总图方案研究[J].铁道标准设计,2017,61(7):23-27,5.