铁道标准设计2017,Vol.61Issue(7):28-31,4.DOI:10.13238/j.issn.1004-2954.2017.07.007
太兴铁路穿越吕梁山段越岭方案研究
Research on Route Selection for Taiyuan-Xingxian Railway Passing through Lvliang Mountain
夏晓鹏1
作者信息
- 1. 中铁工程设计咨询集团有限公司太原设计院,太原 030013
- 折叠
摘要
Abstract
Civil engineers have conducted extensive researches on the route selection of Taiyuan-Xingxian Railway passing through Lvliang Mountain. Based on the control factors in route selection, such as local planning and environmental sensitive sites and so on, this paper studies the following two schemes:one is to pass through Dashilingou pass along Qiushuihe River, and another is to pass through Yejishan pass along Weifenhe River. Analysis and comparison are conducted in terms of project scale, project investment, local planning and environmental protection. It is concluded that the scheme of Taiyuan-Xingxian Railway passing through Dashilingou pass is the best one. This paper proposes a new design concept with details in crossing-mountain design process, which may provide reference for similar projects.关键词
太兴铁路/越岭方案/环境敏感点/地方规划Key words
Taiyuan-Xingxian Railway/Cossing-mountain scheme/Environmental sensitive sites/Local planning分类
交通工程引用本文复制引用
夏晓鹏..太兴铁路穿越吕梁山段越岭方案研究[J].铁道标准设计,2017,61(7):28-31,4.