牡绥铁路双丰隧道富水第三系砂泥岩地层超前注浆加固施工技术

杨昌贤 马志富 张凤武 杨保旭

铁道标准设计2017,Vol.61Issue(7):125-130,6.
铁道标准设计2017,Vol.61Issue(7):125-130,6.DOI:10.13238/j.issn.1004-2954.2017.07.028

牡绥铁路双丰隧道富水第三系砂泥岩地层超前注浆加固施工技术

Construction Techniques of Pre-grouting in Tertiary of Rich-water Sand-shale in Shuangfeng Tunnel on Mudanjiang-Suifenhe Railway

杨昌贤 1马志富 1张凤武 2杨保旭3

作者信息

  • 1. 中国铁路设计集团有限公司,天津 300142
  • 2. 哈牡铁路客运专线有限责任公司,哈尔滨 150050
  • 3. 中铁十九局集团第二工程有限公司,辽宁辽阳 111000
  • 折叠

摘要

Abstract

Shuangfeng Tunnel is the longest tunnel and the key controlling project of Mudanjiang-Suifenhe Railway. About 2. 3 km of the tunnel passes through tertiary sand shale and contact zone with other rock strata. The diagenesis of tertiary sand-shale is of poor quality in part of soft rock and the tunnel is deep-burial with gentle topography. Plenty of water is gathered in the contact zone of the tertiary sandstone and other rocks. The groundwater in this area is characterized by large amount and far uneven in supply source and spatial distribution, which may result in big tunnel deformation, tunnel collapse, water Inflow and soil leakage, and make tunnel construction very difficult. According to this circumstance, the method of full face advance grouting reinforcement after upper bench excavation is employed. By comprehensive effect evaluation and construction test, this method is proved to be effective in strengthening the rock and ensuring safe and successful tunneling.

关键词

铁路隧道/富水第三系砂泥岩/超前注浆/施工技术/注浆效果评价

Key words

Railway tunnel/Tertiary of sand-shale with rich-water/Pre-grouting/Construction techniques/Grouting effect evaluation

分类

交通工程

引用本文复制引用

杨昌贤,马志富,张凤武,杨保旭..牡绥铁路双丰隧道富水第三系砂泥岩地层超前注浆加固施工技术[J].铁道标准设计,2017,61(7):125-130,6.

基金项目

中国铁路总公司科技研究开发计划重点课题(2013G011-B) (2013G011-B)

铁道第三勘察设计院集团有限公司科研开发重点课题(721332) (721332)

铁道标准设计

OA北大核心

1004-2954

访问量0
|
下载量0
段落导航相关论文