铁道标准设计2017,Vol.61Issue(7):125-130,6.DOI:10.13238/j.issn.1004-2954.2017.07.028
牡绥铁路双丰隧道富水第三系砂泥岩地层超前注浆加固施工技术
Construction Techniques of Pre-grouting in Tertiary of Rich-water Sand-shale in Shuangfeng Tunnel on Mudanjiang-Suifenhe Railway
摘要
Abstract
Shuangfeng Tunnel is the longest tunnel and the key controlling project of Mudanjiang-Suifenhe Railway. About 2. 3 km of the tunnel passes through tertiary sand shale and contact zone with other rock strata. The diagenesis of tertiary sand-shale is of poor quality in part of soft rock and the tunnel is deep-burial with gentle topography. Plenty of water is gathered in the contact zone of the tertiary sandstone and other rocks. The groundwater in this area is characterized by large amount and far uneven in supply source and spatial distribution, which may result in big tunnel deformation, tunnel collapse, water Inflow and soil leakage, and make tunnel construction very difficult. According to this circumstance, the method of full face advance grouting reinforcement after upper bench excavation is employed. By comprehensive effect evaluation and construction test, this method is proved to be effective in strengthening the rock and ensuring safe and successful tunneling.关键词
铁路隧道/富水第三系砂泥岩/超前注浆/施工技术/注浆效果评价Key words
Railway tunnel/Tertiary of sand-shale with rich-water/Pre-grouting/Construction techniques/Grouting effect evaluation分类
交通工程引用本文复制引用
杨昌贤,马志富,张凤武,杨保旭..牡绥铁路双丰隧道富水第三系砂泥岩地层超前注浆加固施工技术[J].铁道标准设计,2017,61(7):125-130,6.基金项目
中国铁路总公司科技研究开发计划重点课题(2013G011-B) (2013G011-B)
铁道第三勘察设计院集团有限公司科研开发重点课题(721332) (721332)