压力容器2017,Vol.34Issue(5):64-69,6.DOI:10.3969/j.issn.1001-4837.2017.05.011
第一废热锅炉管束制造工艺研究
Manufacturing Process of Waste Heat Boiler Tube Bundle
刘斌1
作者信息
- 1. 大庆石油化工机械厂,黑龙江大庆163714
- 折叠
摘要
Abstract
The manufacturing process of the first heat recovery boiler tube bundle was introduced.Technology key points are analyzed by the characteristics of equipment and material.Through the raw material purchasing,manufacturing of tubesheet,welding of cap,treatment of parts and expansion process of outube,we make technical specifications and requirements.Technical specifications and requirements are made to ensure the quality of product forms during the manufacturing process.关键词
第一废热锅炉/高温/高压/管束制造Key words
waste heat boiler/high temperature/high pressure/bundle manutacturing分类
机械制造引用本文复制引用
刘斌..第一废热锅炉管束制造工艺研究[J].压力容器,2017,34(5):64-69,6.