1000MW超超临界二次再热燃煤发电示范工程总体设计方案

阳光 陈仁杰 朱佳琪

中国电力2017,Vol.50Issue(6):12-16,31,6.
中国电力2017,Vol.50Issue(6):12-16,31,6.DOI:10.11930/j.issn.1004-9649.2017.06.012.05

1000MW超超临界二次再热燃煤发电示范工程总体设计方案

General Design of 1000-MW Ultra-Supercritical Double-Reheat Demonstration Power Plant

阳光 1陈仁杰 2朱佳琪2

作者信息

  • 1. 中国国电集团公司,北京 100034
  • 2. 华东电力设计院有限公司,上海200063
  • 折叠

摘要

Abstract

In order to promote the energy saving and emission reduction,the Guodian Taizhou Power Plant Phase Ⅱ Project is built as the demonstration project of 1000-MW ultra-supercritical double-reheat coal-fired power generation units.In combination with the current technical levels of domestic coal-fired power plants and based on the comparison and analysis of foreign double-reheat coal-fired power generation units,this paper elaborates the selections of steam parameters and main equipments,the thermal system design,the auxiliary equipment selection and the air pollutant prevention design,etc.The practical operation of the demonstration project shows that the net coal consumption of the two units of this project has reached 266.57 g/(kW· h) and 265.75 g/(kW· h) respectively,while the dust,SO2 and NOx emission concentrations are lower than 5 mg/m3,35 mg/m3 and 50 mg/m3 respectively in standard state,indicating that the project has played a good referential and demonstrative role for the efficient and clean coal-fired power generation construction.

关键词

燃煤发电/1000MW/超超临界机组/二次再热循环/示范工程/总体设计

Key words

coal-fired power generation/1 000 MW/ultra-supercritical unit/double-reheat cycle/demonstration power plant/general design

分类

信息技术与安全科学

引用本文复制引用

阳光,陈仁杰,朱佳琪..1000MW超超临界二次再热燃煤发电示范工程总体设计方案[J].中国电力,2017,50(6):12-16,31,6.

基金项目

国家科技支撑计划项目(2012BAA12B00).This work is supported by the National Key Technology Support Program (No.2012BAA12B00). (2012BAA12B00)

中国电力

OA北大核心CSCDCSTPCD

1004-9649

访问量3
|
下载量0
段落导航相关论文