中国电力2017,Vol.50Issue(6):43-48,6.DOI:10.11930/j.issn.1004-9649.2017.06.043.06
1000M超超临界二次再热机组调试管理研究
Study on Commissioning Management of the Ultra-Supercritical 1000-MW Double Reheat Unit
摘要
Abstract
Since not many double reheat power generation units are in service in China,there is not enough practical experience about their commissioning that has been obtained.To regulate the management process of the double reheat unit commissioning and improve the commissioning techniques,the process of the commissioning management is studied on an ultra-supercritical 1 000-MW double reheat unit.In addition,aiming at single system commissioning and unit start-up commissioning,the project planning,QSHE control,quality control and schedule control are presented in detail with the working focuses put forward.The study result is helpful for conducting safe,good and efficient commissioning management on the units of the same type.关键词
燃煤发电/1000 MW/超超临界机组/二次再热循环/调试管理/示范工程Key words
coal-fired power generation/1000 MW/ultra-supercritical unit/double reheat cycle/commissioning management/demenstration power plant分类
信息技术与安全科学引用本文复制引用
杨宏强,丁建良,管诗骈..1000M超超临界二次再热机组调试管理研究[J].中国电力,2017,50(6):43-48,6.基金项目
国家科技支撑计划项目(2012BAA12B00) (2012BAA12B00)