铁道科学与工程学报2017,Vol.14Issue(7):1361-1368,8.
高铁长大隧道洞内CPII网分多段建网方案探讨
A discussion of multi-segments networking of CPII control network in the long high-speed railway tunnels
摘要
Abstract
The current high-speed rail measurement specifications stipulated that CPII control network of Ballastless track in the tunnels should be completed by one time after tunnel holing through. However, some of the CPII control network in the long high-speed railway tunnels have to divide into Multi-segments due to the tight construction. In this paper, the application was illustrated by the example of Baofeng tunnel-CPII control network for three segments, and the measurement technology of multi-segments networking of tunnel-CPII control network was put forward. Using the hybrid structure network that consists of free-station linear-angular intersection network and crossover traverse network mentioned in the paper and the technology that overlapping data no error handling, the tunnel-CPII control network of meeting the requirement of precision was established. On the other hand, this project also can avoid the risk that lap error is large and difficult to deal with when each segments constructed respectively. So, the solution is worth applying on the CPII control network in the long high-speed railway tunnels.关键词
高铁长大隧道/CPII控制网/分段建网/交叉导线网/自由测站边角交会网Key words
long high-speed railway tunnels/CPII control network/multi-segments networking/crossover traverse network/free-station linear-angular intersection network分类
交通工程引用本文复制引用
王建成,刘成龙,杨思山,刘志..高铁长大隧道洞内CPII网分多段建网方案探讨[J].铁道科学与工程学报,2017,14(7):1361-1368,8.基金项目
长江学者和创新团队发展计划资助项目(PCSIRT) (PCSIRT)