| 注册
首页|期刊导航|电焊机|储罐集油槽整体提升工艺及稳定性校核

储罐集油槽整体提升工艺及稳定性校核

万琳

电焊机2017,Vol.47Issue(6):78-81,4.
电焊机2017,Vol.47Issue(6):78-81,4.DOI:10.7512/j.issn.1001-2303.2017.06.17

储罐集油槽整体提升工艺及稳定性校核

Whole lifting technology and its stability check for oil tank

万琳1

作者信息

  • 1. 新疆油田公司概预算管理部,新疆克拉玛依834000
  • 折叠

摘要

Abstract

A inverted construction technology for storage tank is introduced,namely the whole of oil tank is produced on the bottom of storage tank,and then is lifted by electric chain hoist to make it in place.Comparing with a traditional scaffold construction technology,this technology can avoid plenty of aerial work and effectively guarantee the construction quality and the safety of personnel,equipment and facility,and its construction efficiency is 2~3 times higher than a traditional one's.And through the stability check of whole lifting technology for oil storage tank,the security of whole lifting process is effectively guaranteed,so that this technology can be popularized and applied in the installation and maintenance engineering of all kinds of storage tanks.

关键词

储罐/集油槽/整体提升/稳定性

Key words

storage tank/oil tank/whole lifting/stability

分类

矿业与冶金

引用本文复制引用

万琳..储罐集油槽整体提升工艺及稳定性校核[J].电焊机,2017,47(6):78-81,4.

电焊机

OACSTPCD

1001-2303

访问量0
|
下载量0
段落导航相关论文