河南理工大学学报(自然科学版)2017,Vol.36Issue(4):113-118,6.
双线地铁开挖地表沉降预测及影响分析
Surface sedimentation prediction and impact analysis induced by the double line subway excavation
摘要
Abstract
In order to ease the traffic pressure on the ground surface,majority cities develop the underground engineering.However the subway always is built under the municipal roads,and the pipeline under the ground is inevitablely effected.Some pipelines are need be migrated.In some cases,pipelines can not be migrated due to the objective conditions.Therefore,rational construction measures should be taken to ensure the surface sedimentation and the surrounding pipelines displacement within allowable standard range.Based on Xi'an metro 3 tunnel,firstly the surface sedimentation of the single tunnel are calculated by taking the experience method,and then the settlement of the double line are drawn by using the superposition principle.Secondly the surface sedimentation and the resulted pipeline deformation are studied by employing the different excavation methods based on the FLAC3D simulation model.The theoretical analysis and the numerical simulation results show that the surface subsidence of the double line tunnel is "U" and the settlement trough.The maximum surface subsidence are big than the single tunnel.Moreover,the numerical simulation results show that the ring cut method are employed by comprehensive analyzing of the other elements.Finally,the field monitoring results show that the construction method can effectively reduce the surface subsidence and its influence on both the adjacent bridge pile foundation.Our study is valuable and provide reference in guiding the tunnel project in the loess area.关键词
地表沉降/叠加原理/FLAC3D模拟/管线变形Key words
surface sedimentation/superposition principle/FLAC3D simulation model/pipeline deformation/ring cut method分类
建筑与水利引用本文复制引用
田晓艳,刘静,代建波..双线地铁开挖地表沉降预测及影响分析[J].河南理工大学学报(自然科学版),2017,36(4):113-118,6.基金项目
国家自然科学青年基金资助项目(51405385) (51405385)
陕西省教育厅专项科研计划项目(15JK1562) (15JK1562)
西安石油大学博士科研启动项目(250205002) (250205002)