中国电力2017,Vol.50Issue(7):38-42,5.DOI:10.11930/j.issn.1004-9649.2017.07.038.05
集中式光伏弃光分析及应对措施
Solar Curtailment of Centralized PV Station and Its Countermeasures
摘要
Abstract
The reasons for solar power curtailment of centralized PV station is analyzed from aspects of peak capacity,transport capacity,absorptive capacity and equipment operation.Calculation methods of solar power curtailment based on benchmark PV station and irradiance data restoration are proposed.Calculation is performed on practical operating data by using proposed methods.The application of two algorithms are also described.Finally,measures for promoting PV power consumption and reducing abandoned PV power are presented from aspects of national policy,development planning,dispatching and consumptive market in order to promote a healthy,sustainable and stable development of centralized photovoltaic.关键词
集中式光伏电站/弃光电量/标杆电站/辐照度数据还原Key words
centralized PV power station/abandoned PV power/benchmark station/irradiance data reduction分类
信息技术与安全科学引用本文复制引用
路亮,丁坤,周识远,何世恩,汪宁渤..集中式光伏弃光分析及应对措施[J].中国电力,2017,50(7):38-42,5.基金项目
国家高技术研究发展(863)计划资助项目(2011AA05A104,2012AA050203) (863)
国家电网公司科技项目(522727160002) (522727160002)
This work is supported by the National High-tech R&D Program (863 Program) of China (No.2011AA05A104,No.2012AA050203).R&D Project of SGCC 522727160002. (863 Program)