天广直流工程换流阀异常导通原因分析及对策

王振 钱海 周尚礼 陈欢 国建宝 李晋伟

高电压技术2017,Vol.43Issue(7):2154-2160,7.
高电压技术2017,Vol.43Issue(7):2154-2160,7.DOI:10.13336/j.1003-6520.hve.20170628008

天广直流工程换流阀异常导通原因分析及对策

Cause Analysis and Countermeasures for the Abnormal Conduction of Converter Valve in Tian-Guang HVDC Project

王振 1钱海 1周尚礼 1陈欢 1国建宝 1李晋伟1

作者信息

  • 1. 中国南方电网超高压输电公司检修试验中心,广州510663
  • 折叠

摘要

Abstract

Four abnormal conduction events have occurred in the converter valve of Tian-Guang HVDC project since July 2014.First,we studied the working principle of TE board,and established a simulation model of TE board.Then,we built a test platform of TE board in China Southern Power Grid Company DC transmission Equipment Condition Assessment and Fault Diagnosis Key Laboratory to carry out the voltage test under normal and high humidity environments.Results show that the surface of TE board is seriously polluted after the long time operation,and the threshold of the back-up trigger function is reduced greatly under the high humidity working conditions,resulting in the abnormal conduction of the electric trigger converter valve under the normal charging process of converter transformer.The anti-accident countermeasures such as regularly cleaning the TE board and controlling the valve hall humidity are successfully used in Tian-Guang HVDC project,and ca completely solve the problem of abnormal conduction of the electric trigger converter valve under the normal charging process of converter transformer.

关键词

电触发换流阀/异常导通/换流阀晶闸管电子板/后备触发回路/触发脉冲/加压试验

Key words

electric trigger converter valve/abnormal conduction/converter valve thyristor electronics/backup trigger circuit/trigger pulse/voltage test

引用本文复制引用

王振,钱海,周尚礼,陈欢,国建宝,李晋伟..天广直流工程换流阀异常导通原因分析及对策[J].高电压技术,2017,43(7):2154-2160,7.

基金项目

中国南方电网公司科技项目(012000KK52150018).Project supported by Science and Technology Project of China Southern Power Grid Co.,Ltd.(012000KK52150018). (012000KK52150018)