| 注册
首页|期刊导航|南水北调与水利科技|基于离散元法的顺层岩质边坡的地震响应分析

基于离散元法的顺层岩质边坡的地震响应分析

江婷 沈振中 聂柏松 刘冲 谈家诚

南水北调与水利科技2017,Vol.15Issue(4):136-141,6.
南水北调与水利科技2017,Vol.15Issue(4):136-141,6.DOI:10.13476/j.cnki.nsbdqk.2017.04.022

基于离散元法的顺层岩质边坡的地震响应分析

Analysis of seismic responses of bedding rock slope based on DEM

江婷 1沈振中 1聂柏松 2刘冲 3谈家诚4

作者信息

  • 1. 河海大学 水文水资源与水利工程科学国家重点实验室,南京 210098
  • 2. 中国电建集团华东勘测设计研究院有限公司,杭州 310000
  • 3. 河海大学 水利水电学院,南京 210098
  • 4. 河海大学 大禹学院,南京 210098
  • 折叠

摘要

Abstract

The seismic responses and anchor reinforcement effects of a bedding stereoplasm rock slope with multiple structural planes behind the powerhouse of a hydro-power plant by use of the DEM,and a optimal layout plan of the anchors is proposed.The research shows that displacements of the unreinforced bedding stereoplasm slope under seismic action is present the stepped increases,and the rock blocks fall at the end of earthquake.Displacements of reinforced slope diminish significantly,and the slope can remain stable in the earthquake.The shear force response of the anchor elements shows good agreement with the relative displacement response of the lay of terrain around the anchor element,which means that the relative displacement of the lay of terrain around the anchor is the main stimulation factor of the anchor reinforcement effects in the earthquake and the relative displacement of the lay of terrain emerging on slope surface and at a lower elevation is larger so that the shear force of the corresponding anchor is larger.Hereby this paper put forward the reasonable arrangement schemes of the anchor.

关键词

岩质边坡/结构面/离散元法/地震响应/锚杆/加固

Key words

rock slope/structural plane/DEM/seismic response/anchor/strengthening

分类

建筑与水利

引用本文复制引用

江婷,沈振中,聂柏松,刘冲,谈家诚..基于离散元法的顺层岩质边坡的地震响应分析[J].南水北调与水利科技,2017,15(4):136-141,6.

基金项目

江苏省自然科学基金青年基金(BK2012410) (BK2012410)

国家自然科学基金(51179062) (51179062)

江苏高校优势学科建设工程资助项目(3014-SYS1401) (3014-SYS1401)

中央高校基本业务费用项目(2014B11914) Young Fund of Jiangsu Natural Science Foundation of China(BK2012410);National Natural Science Foundation of China(51179062);Project Supported by the Preponderant Subject Construction Project of Universities in Jiangsu(3014-SYS1401) (2014B11914)

Basic Business Expense Project of Central University(2014B11914) (2014B11914)

南水北调与水利科技

OA北大核心CSCDCSTPCD

2096-8086

访问量0
|
下载量0
段落导航相关论文