摘要
Abstract
Niuchang ancient underground Caverns in City Longyou were built in Southern Song Dynasty and is an important part of national key cultural relics protection unit from Xiao Nanhai cave(the Longyou Grotto).They have old excavation history,rare slanting sidewall-roof structure in No.2 Cavern and plug topside structure in No.1 Cavern.The two cavern chambers get great attentions.But,serious deformation and failure happen in their roofs and slopes at the entrances of both caverns.In order to preserve the relics,this paper has carried a detailed investigationand analyzation about deformation and failure from aspect of engineering geological conditions.It shows that the long-term weathering,especially biological and thin roof composed of gentle-dip red clastic rocks are the main reasons of their deformation and failure.关键词
牛场古洞室/围岩/工程地质条件/变形破坏机理Key words
Niuchang ancient underground Caverns/Surrounding rock/Engineering geological conditions/Mechanism of deformation and failure分类
天文与地球科学引用本文复制引用
方建平,廖小辉,孙亚丽,李丽慧,杨志法,王婷静,傅燕..龙游牛场古工程洞室群变形破坏调查及工程地质条件分析[J].工程地质学报,2017,25(3):598-604,7.基金项目
国家自然科学基金项目(41602303、41372322、41672321),浙江省公益性技术应用研究项目(2014C33012),衢州市科技计划项目(2014Y007)资助. (41602303、41372322、41672321)