| 注册
首页|期刊导航|广东电力|"十三五"广东可接纳西电能力研究

"十三五"广东可接纳西电能力研究

黄欣 左郑敏 孙雁斌 程鑫 卢洵

广东电力2017,Vol.30Issue(7):18-23,6.
广东电力2017,Vol.30Issue(7):18-23,6.DOI:10.3969/j.issn.1007-290X.2017.07.004

"十三五"广东可接纳西电能力研究

Research on Ability of Guangdong Province Accepting Western Electricity in 13th Five-year Plan

黄欣 1左郑敏 1孙雁斌 2程鑫 1卢洵1

作者信息

  • 1. 广东电网发展研究院有限责任公司,广东 广州,510080
  • 2. 中国南方电网电力调度控制中心,广东 广州,510623
  • 折叠

摘要

Abstract

West-east power transmission is effective in relieving power supply pressure in Guangdong province, reducing coal consumption, optimizing power source structure in the province and promoting energy saving and emission reduction.Combining execution of west-east power transmission in 12th five-year plan and according to electricity planning in Guangdong province in 13th five-year plan, this paper uses power system operation simulation software to simulate operation conditions of units in Guangdong province and units for west-east power transmission under many circumstances in 13th five-year plan and comprehensively analyzes acceptable electric quality scale of west electricity in Guangdong province as well as impact of characteristic west-east power transmission curve on peaking characteristic in Guangdong.It suggests that in 13th five-year plan, west-east power transmission should be moderately participate in peaking so as to alleviate peaking pressure in Guangdong and ensure safe and stable operation of Guangdong power grid.

关键词

西电东送/电源规划/消纳能力/调峰能力

Key words

west-east power transmission/power source planning/absorption ability/peaking ability

分类

信息技术与安全科学

引用本文复制引用

黄欣,左郑敏,孙雁斌,程鑫,卢洵.."十三五"广东可接纳西电能力研究[J].广东电力,2017,30(7):18-23,6.

广东电力

OACSTPCD

1007-290X

访问量0
|
下载量0
段落导航相关论文