| 注册
首页|期刊导航|中国卒中杂志|优化缺血性卒中绿色通道流程对院内无缝衔接急救模式的临床研究

优化缺血性卒中绿色通道流程对院内无缝衔接急救模式的临床研究

李楠

中国卒中杂志2017,Vol.12Issue(8):696-700,5.
中国卒中杂志2017,Vol.12Issue(8):696-700,5.DOI:10.3969/j.issn.1673-5765.2017.08.008

优化缺血性卒中绿色通道流程对院内无缝衔接急救模式的临床研究

Clinical Study on Optimization of the Green Channel Process in Acute Ischemic Stroke for the Emergency Mode with Seamless Connection in Hospital

李楠1

作者信息

  • 1. 100050 北京 首都医科大学附属北京天坛医院急诊科
  • 折叠

摘要

Abstract

Objective To investigate the clinical research on optimization of the green channel process in acute ischemic stroke for the emergency mode with seamless connection in hospital. Methods A total of 202 patients with acute ischemic stroke receiving green channel treated in emergency in our hospital from January 1, 2015 to November 30, 2015 were selected as the control group. Another 210 patients with acute ischemic stroke receiving green channel treated in emergency in our hospital from January 1, 2016 to November 30, 2016 were selected as the experimental group. The control group received the conventional green channel process of acute ischemic stroke, while the experimental group received the optimized emergency mode with seamless connection in hospital in acute ischemic stroke. The time from admission to intravenous thrombolysis, the time points of each key link, the satisfaction of doctors to nursing staffs, and the satisfaction of patients and families to nursing staffs between the two groups were compared to see whether there were any differences. Results Through optimizing the green channel process of acute ischemic stroke, the time from admission to intravenous thrombolysis for patients with acute ischemic stroke was continuously shortened (P<0.05); the time of each key link was decreased (P<0.05); thrombolysis rate got increased (P=0.020); the incidence of complications was reduced (P=0.006); and mortality reduced (P=0.009), which had significant differences. Conclusion Through optimizing the green channel process in acute ischemic stroke, the time from admission to intravenous thrombolysis was shortened and the satisfaction was improved, further improving the emergency mode with seamless connection in hospital.

关键词

优化/缺血性卒中/绿色通道流程/无缝衔接/急救模式

Key words

Optimization/Acute ischemic stroke/Green channel process/Seamless connection/Emergency mode

引用本文复制引用

李楠..优化缺血性卒中绿色通道流程对院内无缝衔接急救模式的临床研究[J].中国卒中杂志,2017,12(8):696-700,5.

中国卒中杂志

OACSTPCD

1673-5765

访问量0
|
下载量0
段落导航相关论文