水道港口2017,Vol.38Issue(3):269-273,5.
高桩码头安全评估中桩身完整性检测比例的探讨
Discussion on pile integrity detection ratio in safety evaluation of high-piled wharf
摘要
Abstract
Pile foundation integrity is required to be tested in detection and evaluation of the high-piled wharf in service. According to the current water transport standard, the low strain reflection method was adopted, which demands the number of sampling piles shall not be less than 10% or 20% of the total number of piles and not be less than 10 piles. Besides, the sampling ratio should be expanded when the defects were detected. According to the multi-year safety evaluation of the high-piled wharf in service, especially the problems encountered in the verification of the wharf's berthing capacity and the reinforcement of the coastal wharf structure, the reasonableness of sampling ratio of pile integrity testing was discussed through the comparative analysis of the existing water transport standards, combined with the calculation results of the pile cutting damage effects on the horizontal bearing capacity. It is proposed that the safety detection of the high-piled wharf in service should be based on the qualification of construction quality of wharf pile foundation, so as to eliminate the potential safety hazards arising from the operation. According to the operational factors including operating ages, berthing methods, operating environment, abnormal berthing rate and structure type, piles which bear the worst load or are suspected to be incomplete should be selected as the object in verification testing.关键词
在役高桩码头/桩基完整性/检测/评估/比例Key words
high-piled wharf in service/pile foundation integrity/detection/evaluation/ratio分类
交通工程引用本文复制引用
陈灿明,苏晓栋,何建新,胡烨之,黄卫兰..高桩码头安全评估中桩身完整性检测比例的探讨[J].水道港口,2017,38(3):269-273,5.基金项目
南京水利科学研究院中央级公益性科研院所基本科研业务费专项资金资助项目(Y415003) (Y415003)