路基工程Issue(4):162-166,174,6.DOI:10.13379/j.issn.1003-8825.2017.04.33
内蒙地区黄土隧道大变形控制研究
Control Study on Large Deformation of Loess Tunnel in Inner Mongolia
寇博 1张留俊 2韩常岭1
作者信息
- 1. 中交第一公路勘察设计研究院有限公司,西安710068
- 2. 陕西省公路交通防灾减灾重点实验室,西安710068
- 折叠
摘要
Abstract
The deformation law of loess tunnel surrounding rock in the process of tunnel excavation is known via the monitoring measurement of deformation of the kiln tunnel surrounding rock during construction.The arch settlement value is far greater than the clearance convergence value,so it is clear that the control of the large deformation of loess tunnel should be based on the arch settlement.The ultimate way to control the large deformation of loess tunnel during the construction process through the finite element:timely follow-up of primary supporting can significantly reduce the deformation of loess tunnel surrounding rock;pile treatment for loess tunnel foundation can effectively reduce the deformation of surrounding rock.The construction of system anchor bar has no impact on the deformation of surrounding rock basically.关键词
黄土隧道工程/大变形/监控量测/有限元分析/初期支护Key words
loess tunnel project/large deformation/monitoring measurement/finite element analysis/primary supporting分类
交通工程引用本文复制引用