电力系统保护与控制2017,Vol.45Issue(16):31-38,8.DOI:10.7667/PSPC161302
考虑时间尺度的含DG配电网故障动态恢复策略
Dynamic service restoration strategy considering time scale for distribution network with DGs
摘要
Abstract
A model considering time variation of distributed generation (DG) is proposed here and successfully applied to solving fault recovery problem in distribution network. According to the actual situation that real-time output power of different types of DGs keeps changing over time, multi-period dynamic service restoration based on tensile time scales is considered. A minimum summation of load loss in the restoration period is selected as the main objective function, and the minimum number of switching operations as the secondary objective function. Firstly, the improved binary particle swarm optimization is applied to obtain radial network structure excluding a large number of infeasible solutions. Secondly, the strategy based on optimal recovery path proposed in this paper is used to perform load shedding operation. Lastly, the minimal switch operation problem is solved by enumeration-combination method, then the optimal service restoration switch scheme is eventually obtained. The example shows that maximized service restoration can be achieved with the dynamic coordination between the main grid and DGs.关键词
分布式电源/时间尺度/动态恢复/改进二进制粒子群算法/切负荷Key words
distributed generation/time scale/dynamic restoration/improved binary particle swarm optimization/load shedding引用本文复制引用
齐郑,张首魁,李志,张红颖,郑宇航,黄哲洙..考虑时间尺度的含DG配电网故障动态恢复策略[J].电力系统保护与控制,2017,45(16):31-38,8.基金项目
国家电网公司科技项目(KJ[2013]896号) This work is supported by Science and Technology Project of State Grid Corporation of China (No. KJ[2013]896). (KJ[2013]896号)